See all photos of the restoration of this Camper Bus in our workshop!
Étape 1: Arrivée
Étape 2: Sablage
La coque est entièrement sablée, ce qui nous permet maintenant de travailler sur une surface propre.
Étape 3: Châssis et plancher
Étape 4: Montants des portes et fenêtres
Étape 5: Panneaux latéraux
Étape 6: Arrière
See all photos of the restoration of this Camper Bus in our workshop!
- Stage 1: Arrival
- Stage 2: Sandblasting
- Stage 3: Floors and undercarriage
- Stage 4: Windows and Door Pannels
- Stage 5: Side Panels
- Stage 6: Rear door
- Stage 7: Preparation Paint
- Stage 8: Paint
- Stage 9: Mechanic
- Stage 10: Engine
- Stage 11: Inside works
- Stage 12: Ouside details
Stage 1: Arrival
At the moment there is not much to show, but we will keep you updated with more pictures and videos from this restoration project.
Stage 2: Sandblasting
The hull is completely sandblasted, so we can work with a clean surface.
Stage 3: Floors and undercarriage
Stage 4: Windows and Door Pannels